- possibility of performing perforation and hydraulic fracturing / well logging in one trip and automatic release of the assembly into the well without its subsequent killing;
- time savings on well testing (at least 2 days);
- reducing the costs for well-killing fluid with high specific weight;
- well logging of the interval without attracting additional resources from the workover team to lift the tubing.
Technology of packer perforation followed by hydraulic fracturing or well logging provides
Please fill out this form to send us a request and get detailed information about our products and services.
Need a consultation?
Our experts will answer any question of interest