- optimization of time and operating costs during the perforation using a universal initiating head and a head for absolute pressure in the assembly in the wells with two development objects, as well as sidetracking wells where double density is required;
- reducing the time required for 1 BPO on average up to 24 hours;
- reducing the costs for well-killing fluid and well workover.
Perforation technology with two initiating heads provides
Please fill out this form to send us a request and get detailed information about our products and services.
Need a consultation?
Our experts will answer any question of interest